Generator + Transfer Switch in Alberta
Good coverage · 3 providers
Generator installation with automatic or manual transfer switch.
When to use: Safe connection of a generator to power critical circuits during outages.
- Duration
- 1–3 days
- Typical size
- 7–50 kW
- Permits
- Electrical permit required
Scope of work
- Transfer switch selection
- Panel installation
- Generator connection
- Wiring
- Testing
How this works in Alberta
A transfer switch is what makes a generator safe to the house and the lineman. Without it you are backfeeding a line you do not own.
Alberta providers
3 providers identified. Good coverage.
Finning Canada
UNCLAIMED
Capability verified
Service area based on publicly available information and/or Land Intelligence research.
Industrial Engines Ltd.
UNCLAIMED
Identified
Service area based on publicly available information and/or Land Intelligence research.
ProSolutions Inc.
UNCLAIMED
Identified
Service area based on publicly available information and/or Land Intelligence research.