Generate my free land report Land Reports Tour a real report Example reports by county Buyer guides County Guides Growing zones by city Compare two counties Well depth by county Frost-free days & zones Acreages by town Farm operator guides All guides & tools Contractors Search providers Procurement directory Rapid & low-cost development Rural internet options Grants Program guide Farm Economics Crop planning Steward OS Civilizational Knowledge Permaculture Library Resource Economics Atlas Resilience Quiz About

Resources · Water

Cistern for an Acreage in Alberta: Size, Rules and Cost

A cistern is a sealed storage tank for household water. On Alberta acreages it does one of two jobs: it stores hauled water where there is no well, or it buffers a low-yield well so the house has enough water at peak times. This guide covers sizing, the siting rules, keeping the water safe, and what to budget.

How big a cistern do you need?

The province's Working Well program puts it this way: "A 15,000 L or 3,300 Imperial gallon cistern will store enough water to meet the demand of an average household of four for two-to-three months." It adds that some situations, such as a low-yield well, need smaller storage (Working Well, Maintaining Your Cistern, August 2019).

Size from your own situation:

Siting and construction rules

All three points are from the province's Working Well cistern fact sheet. Check the septic setbacks against your system too: see septic rules and setbacks in Alberta.

Keeping the water safe

A cistern is a private water supply, so the homeowner is responsible for it. The Working Well fact sheet says to:

Alberta Health Services gives step-by-step cleaning and disinfection instructions.

What a cistern costs

No government body publishes cistern prices, and we have not found two reliable published Alberta figures that agree. As a planning figure only, Land Intelligence's own August 2026 market compilation for the Edmonton area puts a cistern at $5,000 to $20,000 installed, depending on size, material, excavation and whether a pump and pressure system are included. It is an estimate, not a quote. Get at least two written quotes that list the tank, excavation, bedding, pump, plumbing and electrical separately.

Related reading