Vegetation, Crops & Animals › Greenhouses & Controlled Environment
Greenhouse + Solar in Alberta
Limited — below target · 2 providers
Greenhouse with integrated solar power system.
When to use: Energy-independent greenhouse operation.
- Duration
- 1–4 weeks
- Typical size
- 100–100,000 sq ft
- Permits
- Electrical permit required
Scope of work
- Solar design
- Panel installation
- Battery installation
- Inverter installation
- Greenhouse electrical integration
- Commissioning
How this works in Alberta
Solar on or for a greenhouse cuts the heating and pumping bill where they hurt most. The crop and the array start working the same roof.