Generate my free land report Land Reports A real report (Crown land) Example reports by county Buyer guides County Guides Growing zones by city Compare two counties Well depth by county Frost-free days & zones Acreages by town Farm operator guides All guides & tools Contractors Search providers Procurement directory Rapid & low-cost development Rural internet options Grants Program guide Farm Economics Crop planning Steward OS Civilizational Knowledge Permaculture Library Resource Economics Atlas Resilience Quiz About

Resources · Solar

Acreage guides for towns in this county: Medicine Hat

Location of Cypress County in Alberta
Cypress County within Alberta

Solar Potential in Cypress County

Cypress County sits in a part of Alberta where summer sun is generous and winter sun is not. Regional NASA POWER-style figures for this belt are about 6.5 kWh/m²/day in high summer and about 1.2 kWh/m²/day in mid-winter. Those figures are horizontal irradiance from the report pipeline's insolation tables for a representative quarter in the county, not a measured year on your roof.

That winter number is the one that sizes batteries, not the July brochure.

Medicine Hat is one of Canada's sunniest cities, and the county figures reflect it. Winter output is the best in the province; wind and hail are the risks.

Why county solar is not a system quote

Irradiance is energy hitting a horizontal square metre. A real array has tilt, azimuth, snow, soiling, inverter losses, and shade. Two parcels a kilometre apart in Cypress County can differ more from trees and roof geometry than from climate.

Use the county figures this way:

A grid-tied system near Medicine Hat can lean on the summer surplus. An off-grid cabin in Cypress County has to live on the winter number or on a generator.

Shade, snow, and chinook

Walk the site on a low-sun day if you can. Mark:

Cypress County is not the desert, but it is not coastal cloud either. Snow slides off a steep enough rack after a chinook more readily than after a still cold week. Design the rack for both.

A simple sizing sketch (not an electrical design)

For a household that uses 10 kWh/day in January:

If that area does not fit the south roof, you need ground-mount, load cuts, or a hybrid. The free parcel report will not replace an electrician, but it will show whether the land even faces the problem honestly.

Hardiness and frost-free days (about 125 in this county) also matter: a food-garden pump in May is a different load than a heated shop in January.

See this for your specific parcel

Generate a free land report for a property in Cypress County →

Sampled data for Cypress County

From a Land Intelligence report run on a representative quarter in Township 12, Range 4, W4. These are measured or record-based values for that location, shown to put the county figures above in context. They are not your parcel.

Fixed south array yield1424 kWh/kWp/yrlatitude tilt, rough feasibility only
Annual insolation1825 kWh/m²global, horizontal
Monthly horizontal irradiance, Cypress County (kWh/m²/day)Jan: 1.31 kWh/m²/dayJFeb: 2.3 kWh/m²/dayFMar: 3.66 kWh/m²/dayMApr: 4.93 kWh/m²/dayAMay: 5.84 kWh/m²/dayMJun: 6.37 kWh/m²/dayJ6.37Jul: 6.64 kWh/m²/dayJAug: 5.62 kWh/m²/dayASep: 3.91 kWh/m²/daySOct: 2.51 kWh/m²/dayONov: 1.38 kWh/m²/dayNDec: 1.02 kWh/m²/dayD1.02
Horizontal irradiance by month from the report pipeline's insolation tables at the sample point. June and December are labelled; the ratio between them sizes an off-grid battery bank.

Neighbouring counties: County of Forty Mile (73 km) · County of Newell (120 km) · MD of Taber (120 km) · MD of Acadia (123 km) · Compare Cypress County with another county

Sampled from the live report pipeline at a representative quarter in Township 12, Range 4, W4 on 2026-10-08: well depth, hardiness zone, solar irradiance (68 well records within 5 km). Text reviewed 2026-10-08. Methodology.

Common questions

Is winter solar enough in Cypress County?

Winter irradiance here is low. Grid-tied systems still work. Off-grid systems must be sized on the winter number or paired with a generator.

Should I clear trees for solar in Cypress County?

Only after you map December shade and any shelterbelt you still want. Clearing is a design choice, not a default.